2020-11-25
  • Author: Massimo, Colin
  • Mounted side flange to pass cables through (see attached picture) and started to set inside equipment
  • Future side panel: might be nice to look into this aluminum enclosure utlity panel
  • Happy Thanksgiving!
2020-11-23
  • Author: Massimo, Colin
  • Completed dark box mounting (see picture).
    • Encountered problems: top middle rail holes (ΓΈ 4.6mm) slightly misaligned (~1-2mm). This blocked the doors closing. Drilled larger hole on right side (5.5mm drill bit) and added spacer from the inside to prevent middle rail from tilting around its axis.
    • Missing side panel: currently at Barnard Center, need to fit equipment in dark box to understand how to cut hole for cables/fiber.
  • Images
2020-11-20
  • Author: Massimo, Colin
  • Crash course to Colin on FEE test stand
  • Dismantle FEE test stand, cut vinyl mat to size and start mounting dark box
2020-11-18
  • Author: Massimo
  • Picked up brass post + matrices holder from Barnard Design Center (see picture)
  • Picked up driver and laser head from Barnard Lab
-- %USERSIG{ColinAdams - 2020-12-08}%

Comments


 
Topic revision: r3 - 13 May 2021, ColinAdams
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback